ENERGY WISE Citations of Excellence
Hydro-Québec has honored 60 business customers and 26 of their consulting partners by awarding them ENERGY WISE Citations of Excellence at special awards ceremonies held in Montréal and Québec. Five customers earned their citations for having completed the greatest number of projects under the Empower Programs. This is Hydro-Québec's way of highlighting outstanding participants in its various energy efficiency programs.
All the projects that earned citations were carried out under the Building Optimization and Industrial Systems components of the Empower Program, and some also benefited from the Efficient Products Programs or Traffic Light Optimization Program—which goes to show that there are all kinds of ways to save energy!
These business customers generated combined annual savings of some 60 million kWh, the equivalent of the yearly residential consumption of everyone in Beloeil!
The certificates handed out at the two ceremonies, attended by over 200 people, attest to the quality of the projects and reward the leaders who have made energy efficiency a cornerstone of their sustainable development strategy. To publicize this tribute, Hydro-Québec will be placing ads in the main dailies and regional papers.
See ad [PDF]
See media plan [PDF]
| Business customers and their consulting partners that received citations | kWh saved (savings)* |
Name of program |
|---|---|---|
| AGRILAIT COOPÉRATIVE AGRICOLE Plant, Saint-Guillaume Optimization of ventilation, cooling and pumping systems CONSULTING PARTNER: GROUPE SOTECK INC. |
143,740 (3 %) | Empower Program for Industrial Systems |
| AIRBOSS ENGINEERED PRODUCTS INC. Plant, Acton Vale Optimization of cooling system CONSULTING PARTNER: FORMATRIX 67 |
1,072,996 (29 %) | Empower Program for Industrial Systems |
| ALIMENTS ASTA INC. Plant, Saint-Alexandre-de-Kamouraska Optimization of refrigeration system |
2,050,520 (11 %) | Empower Program for Industrial Systems |
| ALT HÔTEL QUARTIER DIX30 Hotel, Brossard Efficient lighting, heat recovery from fresh air using heat wheel and heat pump, heat pump on geothermal water loop and heat recovery from wastewater CONSULTING PARTNER: GÉNÉCOR EXPERTS-CONSEILS INC. |
989,137 (50 %) | Empower Program for Building Optimization |
| ANIMALERIE DYNO INC. Commercial building, Lévis Installation of heating system with mixed water loop CONSULTING PARTNER: GÉNÉCOR EXPERTS-CONSEILS INC. |
63,128 (63 %) | Empower Program for Building Optimization |
| ARÉO-FIRE LTD. New building, Saint-Hubert Solar wall, heat wheel, geothermal water loop, radiant floor, and efficient lighting and building envelope CONSULTING PARTNER: CONCEPT R INC. |
291,894 (53 %) | Empower Program for Building Optimization |
| BEAULIEU CANADA Plant, Farnham Modernization of lighting system CONSULTING PARTNER: ENERPLUS |
1 414 596 (12 %) | Empower Program for Industrial Systems |
| BOMBARDIER INC. Plant, Mirabel Optimization of airplane hangar ventilation and compressed-air systems CONSULTING PARTNER: SPEC ÉNERGIE |
1,329,260 (8 %) | Empower Program for Industrial Systems |
| BOULART INC. Plant, Lachine Installation of new, efficient refrigeration system |
858,312 (22 %) | Empower Program for Industrial Systems |
| CAISSE POPULAIRE DESJARDINS SIEUR-D'IBERVILLE Branch, Saint-Jean-d'Iberville Major retrofit, including installation of geothermal system CONSULTING PARTNER: AUBÉ-GAREAU INGÉNIEURS CONSEILS |
377,828 (63 %) | Empower Program for Building Optimization |
| CANADA POST (SNC-LAVALIN PROFAC INC.) Post office, Chambly Measures involving lighting CONSULTING PARTNER: FUSION ENERGY INC. |
25,595 (95 %) | Empower Program for Building Optimization |
| CANADA POST (SNC-LAVALIN PROFAC INC.) Post office, Amqui Measures involving lighting and heating, ventilation and air-conditioning CONSULTING PARTNER: FUSION ENERGY INC. |
94,319 (49 %) | Empower Program for Building Optimization |
| CENTRE DE LA PETITE ENFANCE BUISSONNIÈRE Daycare centre, Waterloo Installation of geothermal system CONSULTING PARTNER: MARTIN ROY ET ASSOCIÉS |
87,081 (56 %) | Empower Program for Building Optimization |
| CHEZ SOI NOTRE-DAME-DE-GRÂCE Housing co-op, Montréal Installation of solar panels to preheat domestic hot water CONSULTING PARTNER: MARTIN ROY ET ASSOCIÉS |
806,969 (59 %) | Empower Program for Building Optimization |
| COMMISSION SCOLAIRE DE LA POINTE-DE-L'ÎLE Installation of lighting |
901,621 | Efficient Products Program |
| COMMISSION SCOLAIRE DE LA RIVIÈRE-DU-NORD École du Joli-Bois, Sainte-Sophie Installation of geothermal system and various lighting measures CONSULTING PARTNER: ECOSYSTEM |
293,928 (45 %) | Empower Program for Building Optimization |
| COMMISSION SCOLAIRE DE LA SEIGNEURIE-DES-MILLE-ÎLES Polyvalente Sainte-Thérèse Installation of geothermal system combined with cassette heat exchanger CONSULTING PARTNER: AUBÉ-GAREAU INGÉNIEURS CONSEILS |
1,502,543 (27 %) | Empower Program for Building Optimization |
| DÉVELOPPEMENT OLYMBEC S.E.N.C. Installation of lighting |
567,106 | Efficient Products Program |
| DOMAINE FORGET DE CHARLEVOIX INC. Domaine Forget, Charlevoix Geothermal loop, plate heat exchanger, roof and windows with high thermal resistance and heat recovery from cold storage CONSULTING PARTNER: THERMÉCA INC. |
331 450 (41 %) | Empower Program for Building Optimization |
| DOUGLAS MENTAL HEALTH UNIVERSITY INSTITUTE Installation of lighting |
886,022 | Efficient Products Program |
| FERME GÉRARD CROFT ET FILS INC. Installation of plate heat exchangers |
6,000 | Efficient Products Program |
| FERME LE PLATEAU Installation of heat pads |
344,400 | Efficient Products Program |
| FRE COMPOSITES (2005) INC. Plant, Saint-André-d'Argenteuil Installation of heat recovery systems and lighting and ventilation control system CONSULTING PARTNER: RESPECS INC. |
1,803,682 (34 %) | Empower Program for Industrial Systems |
| GENPAK LP Plant, Laval Optimization of compressed-air system |
240,837 (35 %) | Empower Program for Industrial Systems |
| GESTION OLYMBEC Le 105 boulevard Marcel-Laurin, Montréal Optimization and integration of various systems CONSULTING PARTNER: GES TECHNOLOGIES INC. |
2,466,944 (51 %) | Empower Program for Building Optimization |
| GROUPE COMMERCIAL AMT INC. Université du Québec à Rimouski, Lévis campus Solar wall, heat wheel, geothermal water loop and variable-frequency drive on pump motors CONSULTING PARTNER: LE GROUPE TECHNICONFORT INC. |
1 633 676 (48 %) | Empower Program for Building Optimization |
| GURIT (CANADA) INC. Plant, Magog Optimization of pumping and cooling systems CONSULTING PARTNER: TEKNIKA HBA |
1,832,915 (12 %) | Empower Program for Industrial Systems |
| HEC MONTRÉAL Installation of motors |
16,390 | Efficient Products Program |
| I.B. PRINTING INC. Printing plant, Beauce Installation of geothermal system CONSULTING PARTNER: CHAUFFAGE GÉOTHERMIQUE JEAN-GUY SAMSON INC. |
83,969 (56%) | Empower Program for Building Optimization |
| INVESTISSEMENTS IMMOBILIERS KEVLAR INC. Installation of lighting |
904,515 | Efficient Products Program |
| L.A. HÉBERT LTÉE Head office and shops, Brossard Efficient building envelope and lighting, heat recovery wheel, solar wall and heating with geothermal water loop CONSULTING PARTNER: ROCHON EXPERTS-CONSEILS INC. |
388,139 (53 %) | Empower Program for Building Optimization |
| LA SOURCE BAINS NORDIQUES La Source spa, Rawdon Implementation of various measures involving heating CONSULTING PARTNER: MARTIN ROY ET ASSOCIÉS |
906,184 (72 %) | Empower Program for Building Optimization |
| LES BRASSEURS DU NORD INC. Plant, Blainville Optimization of several systems by implementing controls and heat recovery measures CONSULTING PARTNER: DESSAU |
1,386,024 (42 %) | Empower Program for Industrial Systems |
| LES ENTREPRISES DE SPORTS JRZ CANADA Plant, Québec Installation of geothermal system CONSULTING PARTNER: CHAUFFAGE GÉOTHERMIQUE JEAN-GUY SAMSON INC. |
60,139 (33 %) | Empower Program for Industrial Systems |
| LES PLATS DU CHEF INC. Plant, Dollard-des-Ormeaux Optimization of refrigeration system |
1,271,199 (14 %) | Empower Program for Industrial Systems |
| MANAC INC. Plant, Saint-Georges Installation of ventilation control system |
523,022 (6 %) | Empower Program for Industrial Systems |
| MARINA PORT-LEWIS (1996) Showroom, Saint-Anicet Implementation of various energy efficiency measures, including radiant floor supplied by geothermal system CONSULTING PARTNER: LES CONSULTANTS LBCD INC. |
250,568 (72 %) | Empower Program for Building Optimization |
| NATURE-ACTION QUÉBEC INC. New building, Beloeil Installation of heat recovery wheel CONSULTING PARTNER: CONCEPT R INC. |
31,626 (61 %) | Empower Program for Building Optimization |
| NUTRIFRANCE LTÉE Plant, Saint-Jean-sur-Richelieu Optimization of refrigeration, lighting and ventilation systems CONSULTING PARTNER: TST ENERGY SYSTEMS INC. |
299,176 (38 %) | Empower Program for Industrial Systems |
| OUTDOOR GEAR CANADA Installation of lighting |
572,701 | Efficient Products Program |
| PISCINES SOUCY INC. New building, Québec Installation of geothermal system and various lighting measures CONSULTING PARTNER: GÉNÉCOR EXPERTS-CONSEILS INC. |
91,476 (60 %) | Empower Program for Building Optimization |
| PRELCO INC. Plant, Rivière-du-Loup Optimization of compressed-air system and installation of efficient lighting |
172,500 (2 %) | Empower Program for Industrial Systems |
| RIVERSIDE SCHOOL BOARD St. Johns School, Saint-Jean-sur-Richelieu Solar wall, heat wheel, geothermal water loop, radiant floor and efficient building envelope CONSULTING PARTNER: DESSAU |
113,972 (49 %) | Empower Program for Building Optimization |
| ROLF C. HAGEN INC. New building, Baie-d'Urfé Installation of natural lighting sensors and heat recovery wheel as part of Leadership in Energy and Environmental Design (LEED) project CONSULTING PARTNER: MARTIN ROY ET ASSOCIÉS |
482,825 (46 %) | Empower Program for Building Optimization |
| RUSSEL METALS INC. Plant, Boucherville Installation of various control systems and efficient lighting |
308,584 (27 %) | Empower Program for Industrial Systems |
| SERRES DAME NATURE Greenhouses, Saint-Gédéon Installation of control system and shade cloth CONSULTING PARTNER: DAMATEX INC. |
236,141 (12 %) | Empower Program for Industrial Systems |
| SERVICE DE LA SANTÉ M.I.C. Installation of lighting |
387,562 | Efficient Products Program |
| SIEMENS TRANSFORMERS INC. Plant, Trois-Rivières Improvement of transformer coil drying process |
106,285 (5 %) | Empower Program for Industrial Systems |
| SOCIÉTÉ D'HABITATION CARDINAL-VACHON Residence, Québec Installation of heat recovery ventilation using cassette heat exchanger CONSULTING PARTNER: GENIVAR |
226,114 (9 %) | Empower Program for Building Optimization |
| SOCIÉTÉ EN COMMANDITE SAINT-LAURENT Place Saint-Laurent, Lévis Installation of geothermal system CONSULTING PARTNER: CHAUFFAGE GÉOTHERMIQUE JEAN-GUY SAMSON INC. |
447,438 (47 %) | Empower Program for Building Optimization |
| SUNCHEF FARMS INC. Plant, Montréal Installation of new, efficient refrigeration system CONSULTING PARTNER: CIMCO REFRIGERATION |
3,670,022 (51 %) | Empower Program for Industrial Systems |
| TRANSPORTS QUÉBEC Replacement of incandescent traffic lights with LEDs |
2,807,329 | Traffic Light Optimization Program |
| VILLE DE LONGUEUIL Replacement of incandescent traffic lights with LEDs |
1,494,347 | Traffic Light Optimization Program |
| VILLE DE VAL-D'OR Booster station, 1er Avenue, Val-d'Or Optimization of municipal pumping system |
145,516 (58 %) | Empower Program for Industrial Systems |
| WESTMOUNT SQUARE (COGIR MANAGEMENT CORPORATION) Installation of lighting |
414,569 | Efficient Products Program |
| Business customers completing the most projects and their consulting partners | Number of projects completed |
kWh saved |
|---|---|---|
| STAPLES BUSINESS DEPOT CONSULTING PARTNER: ÉNERGIE DIRECTE SERVICES COMMERCIAUX |
28 | 3,729,651 |
| CANADA POST (SNC-LAVALIN PROFAC INC.) CONSULTING PARTNER: FUSION ENERGY INC. |
19 | 1,468,444 |
| NATIONAL BANK CONSULTING PARTNER: ENERGENIA INC. |
11 | 485,808 |
| COMMISSION SCOLAIRE DE LA CAPITALE CONSULTING PARTNERS: ECOSYSTEM AND BPR |
11 | 615,027 |
| COMMISSION SCOLAIRE DE LA RIVIÈRE-DU-NORD CONSULTING PARTNER: ECOSYSTEM |
9 | 885,225 |
Savings in percentages are only available for projects carried out under one of the Empower programs.
© Hydro-Québec, 1996-2009. Tous droits réservés.