Power Transmission Projects

120-kV Supply Line for the Joanna Mining Project

At a Glance
Status: Under study
Region: Abitibi-Témiscamingue
Owner: Hydro-Québec TransÉnergie
Documents

For further information:

Véronique Décoste
Advisor – Community relations
E-mail: decoste.veronique@hydro.qc.ca
Toll-free: 1 800 903-9705, extension 4246
Joanna Mining Project

Aurizon Mines Ltd. is currently exploring and conducting feasibility studies on the gold-bearing Joanna Property.

Hydro-Québec has been mandated to connect the future mine to the power transmission system. To do so, Hydro-Québec will build a 1.5 km-long 120-kV line. It will supply approximately 22 MW at the beginning of site operation, which may increase to 25 MW in the future.

Hydro-Québec is conducting the draft-design studies for the construction of the projected supply line.

To learn more about this project, consult the Documents section.