Power transmission – Integration of wind farms
| Status: | Under study |
| Region: | Bas-Saint-Laurent |
| Owner: | Hydro-Québec TransÉnergie |
In French only
For more information about the project, contact:
Catherine Bujold
Advisor – Community Relations – Matapédia
Hydro-Québec
355, boul. Saint-Germain Ouest, 1er étage
Rimouski (Québec) G5L 3N2
Info-projects Line
1 866 724 1369
The 100-MW Vents du Kempt wind farm is among the projects selected in Hydro-Québec's second call for tenders for the purchase of 2,000 MW of wind power.
To bring the wind farm's output onto its transmission grid, Hydro-Québec must build a 120-kV single-circuit line from the wind farm developer's substation to the Hydro-Québec system, near the Causapscal substation.
Hydro-Québec is carrying out draft-design studies for the new line. Work is expected to start in winter 2014, with commissioning slated for fall 2014.
To learn more about the project, consult the Documents section above.