Potential vehicle charging sites

Lieux publics : 20 % | Au travail et à la maison : 80 %

Source : Electric Power Research Institute

Main charging sites will be at the home. Together, we are going discover a whole new way of filling up. Every morning, our cars will be fully charged with clean energy. In fact, we will soon be able to meet most of our charging needs at home, at work or in a parking lot used on the job. This should allow us to meet over 80% of our charging needs.

According to a September 2009 Hydro-Québec survey, 94% of Québec households owning or intending to acquire a vehicle already have parking spaces at home, and 89% of those households already have access to a standard outlet (120 volt, Level-1 charge) at those parking spaces.

Québec is therefore already well positioned to meet residential charging demand.

At home
Charging site: at home
At work — public parking lot
Charging site:  public parking lot
Public charging stations (from spring 2012)

The Electric Circuit - Powered by
Hydro-Québec

Founding partners


An initiative of

For more information

Standard outlet – 120V

Maximum charging time

Plug-in hybrid vehicle:
generally 6 to 8 hours

100% electric vehicle:
generally 11 to 16 hours

Charging station – 240V

Maximum charging time

Plug-in hybrid vehicle:
generally 3 to 4 hours

100% electric vehicle:
generally 6 to 8 hours

Fast-charge station – 400 V (or more)