315/120/25‑kV Argenteuil Substation and Supply Lines
Documents
Public Consultation bulletin – Winter 2019-2020
Human and environmental inventory
- Poste d’Argenteuil à 315-120-25 kV et lignes d’alimentation - Inventaire des milieux naturel et humain [PDF 4.58 MB – in French only]
New version of the map with additional inventories planned for the end of September 2020.
Advertorial – Fall 2020
Press review
- Article: February 28, 2020 | Projet Hydro-Québec : nouvelles lignes de vie pour Argenteuil | Journal L’Argenteuil [in French only]
- Report: December 12, 2019 | Hydro planche sur un nouveau projet dans la MRC d’Argenteuil | CIME FM 103,9 [in French only]
- Article: October 25, 2019 | Plusieurs millions attendus d’Hydro-Québec dans Argenteuil | Journal L’Argenteuil [in French only]
3D representation of the future Argenteuil substation
Visual Simulations
- View of the future substation looking south from rue Cardinal, Lachute - February 2020 [PDF 3.73 MB – in French only]
- View of the future supply lines to the west from the route des Seigneurs, Saint-André-d'Argenteuil - February 2020 [PDF 3.38 MB – in French only]
- View of the supply lines to the north from Chemin de l'Île-aux-Chats, Saint-André-d´Argenteuil, September 2020 - [in French only] [PDF 14.7 MB – in French only]
- View of the future substation from avenue d'Argenteuil looking south, Lachute, September 2020 - [in French only] [PDF 15.9 MB – in French only]
- View of the future substation from the west, Lachute, September 2020 - [in French only] [PDF 15.4 MB – in French only]
- View of future supply lines to the west from Chemin du Coteau des Hêtres, Saint-André-d´Argenteuil, September 2020 - [in French only] [PDF 4.84 MB – in French only]
Note: We are carrying out several technical tests to illustrate, as faithfully as possible, the positioning of the new project equipment in the landscape. Work continues and new visual simulations will be performed.
Videos
- Video: March 11 | Video of public consultation regarding the new Argenteuil substation | Productions Myck Yelle [in French only]
- Video: March 11 | Video about high-voltage lines and electric and magnetic fields | Productions Myck Yelle [in French only]
- Video: Substation site and the two transmission line routes with the least impact (in French only)