Government Authorizations

Application for a Certificate of Approval – March 7th 2017

Environmental Assessment – January 2017

Visual simulations made during the optimization studies of the line route

Visual simulations showing the selected route

Note: An iteration is a trial. We conduct numerous trials before positioning the towers to meet the technical criteria and ensure integration into the landscape. Here is the result of the third trial. Work to optimize the route continues.

Towers and right-of-way

Inventory maps

Other documents

Documents distributed during the public consultation process

Press releases