Anjou Substation and 315-kV Transmission Line
Videos and documents
Info-travaux
- Construction of a new 315 kV tranmission line - February 2024 [PDF 274 Ko - in French only]
- Preparatory work for the construction of the new transmission line [PDF 319 KB – in French only]
- Start of work – March 2023 [PDF 156 kB]
- Preliminary work – July 2021 [PDF 227 kB]
Bulletins
- Anjou Substation and 315-kV Transmission Line – Solution Selected [PDF 1 MB]
- Anjou Substation and 315-kV Transmission Line – Project Summary [PDF 879 KB]
Visual simulations (In French only)
- Visual simulation of the proposed substation – October 2020 [PDF — 8.63 MB]
- Visual simulation of the proposed line from Boul. Lacordaire – October 2020 [PDF — 533 KB]
- Visual simulation of the proposed line from Rue J.-B.-Martineau – October 2020 [PDF — 706 KB]
- Visual simulation of the proposed line from Rue Pascal-Gagnon – October 2020 [PDF — 557 KB]
- Visual simulation of the proposed line from Rue Ernest-Ouimet – October 2020 [PDF — 606 Ko]
- See visual simulations
