Nature of the project
Existing facility
Description
The following devices or measures were installed:
- High-efficiency cooling system with variable speed drive (VSD) compressor
- LED fixtures featured on the DLC Premium list in a 10,000-m2 office building
- Adaptive controls
- Heat wheel (heat recovery from fresh air)
- VSD-equipped 100% fresh-air HVAC systems
- Thermal storage unit (hot water storage tank) for power management
- Drain-water heat recovery
- Additional roof insulation
- Triple-glazed windows
Area of activity
- Commercial (e.g., head office of a large corporation)
Total
financial assistance
$247,610
Project details
Measures implemented | Financial assistance |
---|---|
Installation of a 250-TR water-cooled centrifugal chiller with an energy efficiency ratio (EER) of 21.50 Btu/hr/Watt | $10,945 |
Cooling system with variable speed drive (VSD) compressor | $4,550 |
Installation of a 65,000-litre thermal storage unit (hot water storage tank) (difference of 47.5°F) | $99,600 |
1,000 LED light fixtures (3,500 lm) featured on the DLC Premium list installed in open-plan areas (support of $21.50/unit)** | $21,545 |
Installation of adaptive controls (support of $9,75/unit**, or 45% of per-unit support) | $9,695 |
Installation of 100 light fixtures (800 lm) featured on the DLC Premium list in the corridors (support of $5/unit) | $490 |
Heat recovery through the heat wheel installed on the 100% fresh-air intake system (10,000 L/s) | $62,360 |
Variable-frequency drive with CO2 sensor installed on the 100% fresh-air intake system | $21,520 |
10 drain-water heat recovery systems installed (support of $250/unit) | $2,500 |
1,000 m² of roof insulation installed (heat resistance of 1.50 m²∙°C/W) | $4,895 |
800 m² of triple-glazed windows installed (U = 1.60 W/m²∙°C) | $9,510 |
Total | $247,610* |
**Receive an extra 45% when you install adaptive lighting controls.
Benefits of the measures and program
- Heating
- Reduced heating needs due to improved thermal envelope efficiency
- Reduced power demand due to the thermal storage unit
- New cooling system
- Less electricity used for air conditioning
- LED lighting
- Guaranteed energy efficiency of LED fixtures qualified by DesignLights Consortium
- Up to 48% less electricity used when lighting with DLC Premium light fixtures compared with the market benchmark
- Save even more with adaptive controls designed to adjust lighting to meet needs
- 100% fresh-air intake system
- Reduced heating costs through heat recovery and installation of a VFD with a CO2 sensor
- Reduced domestic hot-water heating costs due to heat recovery systems
- Simplified financial assistance calculation with the OSE tool
Have an energy efficiency project and want to find the right program for you?
Calculate the financial assistance you could receive to carry out your projects.
The OSE tool gives you access to over 200 measures for which the savings and financial assistance are calculated in advance.
The tool helps you:
- validate the eligibility of the measures you’ve selected;
- assess the amount of financial assistance you may be entitled to receive;
- submit your request for financial assistance
Watch this short video to learn how to use the OSE tool. [in French only]
Discover concrete effects of our program through our project examples
See all case projectsBusiness newsletter
Stay informed on our energy efficiency programs and our demand response offers.